"You Can't Build There."
That's what three contractors told Mark Stevens when they saw his Olalla property. Five acres of pristine forest. Three ancient Douglas firs over 200 years old. A 15-foot elevation drop. A seasonal creek. Underground utilities. And enough environmental restrictions to make a lawyer cry.
Mark's dream of a professional cabinetry workshop seemed dead. His business was exploding—$65,000 in revenue working from a cramped garage—but he was turning away work daily. The property he loved was apparently his biggest obstacle.
Then Mark called us. Where others saw impossibility, we saw puzzle pieces waiting to be solved.
Four years later, Mark runs a $180,000/year custom cabinetry business from a workshop that looks like it grew from the forest floor. The ancient trees? Thriving. The creek? Protected. The business? Transformed.
Here's how we turned 'impossible' into incredible.
The Challenge: Nature's Obstacle Course
The Three Giants
Three Douglas firs dominated the property. Not just trees—monuments. The smallest was 5 feet in diameter, the largest nearly 7 feet. Their root systems extended 100+ feet in every direction. Their canopy created a cathedral 180 feet high.
Removing them would have:
- Cost $15,000+ per tree
- Destroyed the property's character
- Triggered environmental review
- Devastated Mark's family (his kids had named them)
But building around them? That's where everyone else gave up.
The Invisible Minefield
Underground, the challenges multiplied:
- Septic field: Exactly where the ideal building site was
- Power lines: Crossing diagonally through the only flat area
- Well line: Running to the house through prime building space
- Fiber optic cable: Unmarked until we found it (carefully)
One wrong excavation would cost thousands and weeks of repairs.
The Regulatory Maze
Kitsap County's rural building codes are complex. Add environmental protections:
- 100-foot creek setback
- Critical root zone protection for significant trees
- Stormwater management requirements
- Wildlife habitat considerations
- Native growth protection areas
Most contractors won't even bid these jobs. Too much risk. Too much complexity.
The Solution: Engineering Meets Ecology
Step 1: Understanding the Land
We didn't start with building plans. We started with tree roots.
Our certified arborist spent two days mapping:
- Critical root zones (30-foot radius minimum)
- Feeder root patterns
- Canopy drip lines
- Wind load patterns through the trees
- Seasonal water flow
Cost: $1,200. Value: Priceless. This map became our treasure map.
Step 2: The 40x50 Puzzle
Overlaying all constraints—roots, utilities, setbacks, topography—revealed exactly one buildable area: 40x50 feet of relatively flat ground, tucked between the giants.
But even this required creativity:
- Shape the building to curve around root zones
- Adjust post locations to miss major roots
- Orient the structure to minimize canopy conflicts
- Design drainage to follow natural patterns
The final footprint looked like Tetris. But it fit.
Step 3: Surgery, Not Sledgehammers
Traditional excavation would have destroyed everything. Our approach:
Surgical Post Placement:
- Hand-dug test holes to locate roots
- Adjusted post locations up to 3 feet to avoid major roots
- Air spade excavation near critical root zones
- Deeper posts (5-6 feet) for stability without wide footings
Minimal Impact Access:
- 12-foot temporary road through trees
- Rubber-tracked equipment to reduce ground pressure
- Materials staged outside forest, hand-carried final distance
- Every tree protected with barriers
Construction: Dancing with Giants
Week 1-2: Foundation Without Destruction
October 2020. Perfect weather window. Our process:
Day 1-3: Delicate Excavation
- Located every utility with hand digging
- Exposed roots carefully, worked around them
- Adjusted 5 post locations to protect roots
- Arborist on-site daily
Day 4-7: Precision Foundation
- Set posts between root systems
- Used special concrete mix (less heat generation)
- Created drainage channels away from trees
- Installed root barriers where needed
Zero root damage. Trees didn't even notice we were there.
Week 3-4: Building in Nature's Living Room
Framing between giants required choreography:
- Crane placement: 60 feet away, extended boom over trees
- Truss installation: Threaded between branches
- Height adjustment: 16 feet walls to clear lower branches
- Every lift planned: No room for errors
Workers said it was like building inside a cathedral. Quieter. More careful. More respectful.
Week 5-6: The Finishing Touches
- Forest green siding: Building disappears into surroundings
- Burnished slate roof: Matches forest floor colors
- Strategic windows: Capture filtered forest light
- Minimal site lighting: Preserve dark sky environment
The Business Transformation
From Garage to Gallery
Mark's old garage workshop:
- 400 square feet cramped between cars
- Constant interruptions from family
- No room for lumber storage
- Dust everywhere in the house
- Clients never saw where pieces were made
The forest workshop:
- 1,296 square feet of dedicated space
- 16-foot ceilings for vertical storage
- Three work zones: rough, fine, finishing
- Client consultation area with forest views
- Instagram-worthy setting for marketing
The Numbers Tell the Story
Year Before Workshop (Garage Era):
- Annual revenue: $65,000
- Average project: $2,800
- Lead time: 8-10 weeks
- Jobs turned away: 40%
Year 1 (2021):
- Revenue: $95,000
- New equipment purchased
- Efficiency up 40%
- First high-end clients
Year 4 (2024):
- Revenue: $180,000
- Average project: $6,500
- Lead time: 4-6 weeks
- Waiting list for commissions
- Teaching workshops: $500/day extra
The Unexpected Marketing Magic
The forest setting became Mark's biggest business asset:
- Instagram followers: From 200 to 8,000
- Featured in: Fine Woodworking, local magazines
- Client perception: "Artisan in the forest" commands premium prices
- Workshop tours: Part of the client experience
- Photography backdrop: Every piece photographed on-site
"Clients pay 40% more because the story is part of the value." - Mark
Four Years Later: Measuring Success
The Trees Won
Annual arborist inspection results:
- Zero construction stress detected
- New growth patterns normal
- Root systems thriving
- One tree added 18 inches circumference
- Wildlife activity increased (not decreased)
"The trees are healthier than before construction. That's rare." - Certified Arborist report
The Environment Won
- Creek flow unchanged
- Native plants returned quickly
- Deer still use traditional paths
- Owl family still nests in big fir
- Neighbors compliment the minimal impact
The Business Won
- Revenue growth: 177% in four years
- Profit margins: Up 60% (premium pricing)
- Work-life balance: Separate space improved family life
- Health improvement: Dust collection, natural light
- Business value: Estimated $400,000+ with property premium
Investment Breakdown: The Truth
Base 36x36 building: $38,000
Site complexity additions:
- Arborist consultation: $1,200
- Hand excavation: $3,500
- Root protection measures: $2,000
- Access road (temporary): $1,800
- Special equipment/methods: $2,500
Total investment: $49,000
Property value increase: $65,000 (2024 appraisal)
Annual revenue increase: $115,000
Payback period: 5 months
Lessons from the Forest
What Mark Learned
"Everyone focused on what we couldn't do. ProBuilt focused on what we could do. That made all the difference."
"The constraints forced creativity. My workshop is better because of the trees, not despite them."
"Clients visit to see the workshop as much as discuss projects. The setting sells itself."
"My kids still play in those trees. My business thrives beneath them. That's success."
- Mark Stevens, Stevens Custom Cabinetry
What We Learned
- Site constraints spark innovation: Our most interesting projects have the most challenges
- Respecting nature pays dividends: Environmental sensitivity attracts premium clients
- Investment in planning saves money: The $1,200 arborist fee saved $15,000+ in potential mistakes
- Local knowledge matters: Generic contractors couldn't solve this
- Patience pays: 6-week construction vs. 4 weeks standard, but perfect outcome
Your "Impossible" Property Awaits
Maybe you're staring at your own puzzle:
- Trees you refuse to cut
- Slopes everyone says are too steep
- Wetlands requiring massive setbacks
- Utilities crisscrossing your dreams
- Regulations that seem insurmountable
Mark faced all of these. Now he runs a thriving business in a workshop that magazine editors beg to photograph.
The secret? Working with builders who see solutions, not obstacles. Who respect the land while serving your needs. Who have the experience to navigate complexity and the creativity to find answers.
Ready to Solve Your "Impossible" Site?
Call ProBuilt at (253) 434-0550. We'll visit your property—no matter how challenging—and show you possibilities others miss.
Because "impossible" is just another word for "needs better engineering."
Your trees can stay. Your dreams can grow. Let's make both happen.
ProBuilt Metal Buildings: Where Challenges Become Opportunities.